Our objects
Our company has installed equipment on many construction sites in the Northwestern district, the most famous of which are:
Specialized basketball complex “Spartak”
(Saint Petersburg, South Road, 25)
Gross building area: 19 212 sq. m.
Engineered and installed systems:
- Ventilation
- Refrigeration supply.
Trade center “Galleria”, “SPORTMASTER”
(Saint Petersburg, 26-38, S = 1500 sq. m.)
Installed systems:
- Ventilation
- Refrigeration supply (Lessar coolers)
Business center A class “Avstraliyskiy”
(Saint Petersburg, Orenburgskaya street, 4)
Gross building area: 6289 sq. m.
Installed systems:
- Ventilation
- Air conditioning.
Trade center “Grand Canyon”, “SPORTMASTER” HYPER
(Saint Petersburg, Engels prospekt, 154, S = 4000 sq. m.)
Installed systems:
- Ventilation
- Air conditioning (Mitsubishi conditioners).
Business center A class “Singer House”
Gross building area: 9 700 sq. m.
Engineered and installed systems:
- Ventilation (Systemair ventilation)
- Air conditioning (Chiller and fan coil units; 1,2 MW refrigeration capacity; Wesper trademark chillers, McQuay and Wolf fan coils).
Southwest CHP Plant, Compressor station
(Coal port, Elevator Site, sector 1)
Partners: нюн «Stroytransgaz»
Installed systems:
- Ventilation (Besa and Systemair ventilation)
- Heating systems (Frico heaters)
- Heating supply
- Water supply
- System of sewers.
1st and 2nd stages of the Saint Petersburg flood prevention barriers
Gross building area: 11 000 sq. m.
Partners:
Federal state-owned enterprise «Directorate for Rosstroi Prevention Facilities. ZAO North Administration for Construction»
- Ventilation (Komfovent and Systemair ventilation)
- Air conditioning (Daikin).
Thermal equipment factory and storage rooms
(Tosno, S = 30 300 sq. m.)
Partners:
ZAO «Agency for reconstruction and development of the «Shushary» non-residential area»
Installed systems:
- Storm sewer system
- Heating
ннн NIIEFA-energo production complex
(Metallostroy settlement, S = 12 400 sq. m.)
Partners:
ZAO «Evrostroy-Soyuz», ZAO «Zhilischnoye stroitelstvo»
Installed systems:
- Ventilation (VTS ventilation systems)
- Heating systems (KONRAD heaters)
- Water supply
- Sewer system
- Storm sewer system
Hotel complex “Summer Palace”
(Petrodvorets, Saint Petersburg highway, S = 6 900 sq. m.)
Partners:
ннн “Riviera-Travel”,
ннн «Building company "ALIOT"
Installed systems:
- Ventilation (REMAK ventilation)
- Refrigeration supply (Chiller and fan coil units; 0,5 MW refrigeration capacity; McQuay chillers, McQuay and LESSAR fan coils)
- Heating, water supply and sewer system
“Suzuki” automobile dealership
(St. Petersburg, Dunayskiy prospekt, 21)
Partners:
ннн «Baltspezstroy»
Engineered and installed systems:
- Ventilation (REMAK and BESA ventilation systems)
Gallery 1814
(St. Petersburg, Stachek square, 7A)
Gross building area: 5000 sq. m.
Partners:
ннн «Finance and Industrial Park «ABS»
Installed systems:
- Ventilation
- Air conditioning
Business center B+ class “Senator”
”, St. Petersburg, 18th line, Vasilyevsky Island, 31
Gross building area: 60 000 sq. m.
Partners:
нюн Financial Holding Company “Empire”
ннн «Nevskiy Bereg».
Engineered and installed systems:
- Ventilation (Komfovent and Wesper ventilation systems)
- Air conditioning (Chiller and fan coil units; 4 MW refrigeration capacity; Johnson Controls (York) chillers, McQuay fan coils)
1st and 2nd stages of B+ class Business centers “Senator”
(Saint Petersburg, Professor Popov street, 37)
Gross building area: 5 000 sq. m.
Engineered and installed systems:
- Ventilation (Korf ventilation units)
- Air conditioning (Chiller and fan coil units; 0.7 MW refrigeration capacity; McQuay chillers, McQuay fan coils)
2nd stage of Business center B+ class “Senator”
(St. Petersburg, 6th Krasnoarmeyskaya street, 7)
Gross building area: 4200 sq. m.
Engineered and installed systems:
- Ventilation (Wesper ventilation systems)
- Air conditioning (Chiller and fan coil units; 1 MW refrigeration capacity; McQuay chillers, McQuay fan coils)
Restaurant complex «Bul-Var»
(St. Petersburg, Marshal Kazakov street, 12, block 2)
Engineered and installed systems:
- Ventilation
- Air conditioning
ннн «Hanner SPB Development»
(Saint Petersburg, Pulkovo highway, 30)
Gross building area: more than 30 000 sq. m.
Installed systems:
- Ventilation
- Heating (heating units Sonniger (AERMAX)
- Waterworks
- Sewer systems
|